Know Your Rights: RERA & Property Laws
As a homebuyer in Bihar, Ranchi, or Kolkata, you are protected by specific technical mandates.
The 5-Year Rule
Under RERA, the builder is responsible for fixing structural or workmanship defects for 5 years from the date of possession.
Pre-Handover Rectification
You have the right to demand a snag-free home before final possession. Don't let site staff pressure you into signing the letter.
Zero Extra Cost
Any technical defects identified during the handover window must be corrected by the builder at their own expense.
The Possession Guide
Follow these 3 steps to ensure a smooth handover in your city:
-
1
Schedule the Audit First
Book your GharCheck audit 2-3 days before your official handover meeting with the builder.
-
2
Submit the Snag List
Share our PDF report with the project manager. Get a written commitment on the rectification timeline.
-
3
Final Sign-Off
Only sign the possession letter once major critical defects (seepage, earthing, etc.) are resolved.
Ready to start?
Download our digital checklist or book a senior engineer for a professional deep-dive audit.
Real Defects We Caught
Nothing builds trust faster than showing real evidence of real problems. Here are some critical defects our experts identified during recent inspections.
High Severity
Moisture Measurement
Aqua City, Patna
Critical
Electrical Safety Audit
Venus Paradise, Patna
High Severity
Active Seepage
RD Heights, Patna
Medium Severity
Tile Grout Failure
Venus Empire, Patna
Medium Severity
Switchboard Safety
R.R Builders Project, Patna
Medium Severity
Wall Plaster Damage
Patna Project Site
*Note: Images are for illustrative and reference purposes only and may not be from the specific project mentioned. We maintain professional ethics and do not intend to defame any builder or project. All defects shown are real technical issues caught during various inspections.